Within the framework of the Energy Economies Certificates (EEC) certificates, Loris enr participates in the operation "Bringing energy savings" set up by the Ministry of Ecological and Solidarity Transition. The “boost” operation allows all households to benefit from a bonus to help them finance certain energy savings works. Modest and very modest households will be able to benefit from greater premiums.
Thanks to this operation, Loris ENR helps you replace your old boiler (fuel oil, coal, gas, other than condensation) with a heating solution using renewable energies.
The premiums are paid by Loris Enr, signatory of the charter "heating boost" . The beneficiary can only claim for the same operation only one premium paid within the framework of this system.
Our offers
“heating boost” operation is based on five offers , in order to maximize your energy savings. Loris ENR can enhance your energy savings work and thus make you benefit from the premiums of the "Heating boost" system as described below.
Loris Enr enhances the installation of your biomass boiler and gives you a bonus of at least € 2,500 . The latter is only applicable for work in a detached house.
Thanks to a boost, benefit from a bonus of at least € 2,500 for the installation of a new air/water or water/water type heat pump.
For the replacement of your individual boiler (fuel oil, coal, gas, other than condensation) by a hybrid heat pump, benefit from a bonus of at least € 2,500 .
Install a combined solar system for heating and production of domestic hot water and benefit from a bonus of at least € 2,500. This offer only concerns work in existing individual houses. The implementation of this system must replace an individual fuel boiler (fuel oil, coal, gas, other than condensation).
The connection of an individual house to a heat network allows you to obtain a bonus of at least € 450. The invoice must indicate the nature of the fuel and the fact that the deposited boiler is not condensing.
Opt for wood heating and benefit from a bonus of at least € 500 . The implementation of this system must replace heating equipment operating mainly on coal and not a boiler.
For the replacement of your individual boiler (fuel oil, coal, gas, other than condensation) by a gas boiler with very high energy performance, benefit from a bonus of at least € 600 .
Install an electrical emitter with electronic regulation with advanced functions and benefit from a bonus of at least € 50.
Install an evacuation duct of combustion products and benefit from a bonus of at least € 450.
Procedures for obtaining financial incentives
In order to benefit from the boost bonuses, please follow the process described below:
For more information on the boost system: Ministry of Ecological and Solidarity Transition .
Within the framework of the system of energy savings certificates (CEE), Loris ENR participates in the operation "Blood renovation effective renovation of collective residential building" set up by the Ministry of Ecological and Solidarity Transition.
The “COUPE DE PUCE DE PUCE DE PUCE DE REVOVATION Efficient for collective residential building” was set up by the decree of March 25, 2020 , published in the Official Journal of April 1 , 2020, modifying the decree of December 29, 2014 relating to the methods of application of the system of energy savings certificates is part of the system of energy savings certificates. It was extended by the decree of October 8, 2020 , published in the Official Journal of October 11, 2020, and was modified by the decree of March 11, 2021 , the decree of October 22, 2022 and the decree of June 27, 2023 .
The aim of this system is to financially encourage owners of collective residential buildings in mainland France to achieve an efficient global renovation of their real estate assets, in particular when it includes the change in their boiler fueled by fossil fuels.
Loris Enr sets up an offer for the overall renovation of collective residential buildings, by means of work on common areas or work of collective interest on private parties carried out within the framework of the standardized operating sheet within the framework of the standardized CEE Bar-Th-145 "Global renovation of a residential building (Metropolitan France ) " global of a residential building (mainland France) ”.
ATTENTION ! This system was modified by the decree of September 6, 2024 published in the Official Journal of September 17, 2024, by removing the standardized Operation sheet Bar-Th-145 “Global renovation of a collective residential building (Metropolitan France)” from November 1, 2024 and by introducing from this date a new standardized operation sheet: Bar-Th-177 “ Collective residential (Metropolitan France) " and a new boost" efficient renovation of collective residential building ".
Modalities for the application of the boost relating to the Bar-Th-1977 sheet:
What is the work calander?
The Bar-Th-177 sheet as well as its associated boost, apply to operations initiated from November 1, 2024 until December 31, 2025 and completed until December 31, 2027.
Attention !
Some collective buildings may obtain an exemption from the entry into force of the new boost Bar Th 177:
In these cases, the Bar-Th-177 sheet and its associated boost apply to operations initiated from March 1, 2025 and the boost Bar Th 145 apply to operations undertaken until February 28, 2025 and completed no later than April 30, 2027.
Beneficiaries' eligibility criteria & geographic coverage area
This boost operation is reserved for owners of collective residential buildings in mainland France. In particular concerned, condominiums in the residential sector, represented by their syndicate of co -owners, and social landlords are, are concerned. The condominiums must be registered in the registration register of the condominiums provided for in articles L. 711-1 and following of the construction and housing code.
In the case of work to be carried out within a condominium, the decisions concerning the carrying out of work in the common areas or on the equipment of the co -ownership are taken by all the co -owners during the general meeting.
To achieve the realization of the work decided by the condominium, different stages must be respected:
For more details, you can refer directly to the National Agency for Housing Information (Anil).
Technical criteria and Eligibility conditions to respect for the Th 177 bar sheet and its boost:
The work carried out within the framework of the Th 177 bar sheet and its associated boost is defined by an energy audit prior to the completion of the work, carried out in accordance with article 8 of the decree of November 17, 2020 relating to the technical characteristics and methods of carrying out the work and services whose expenses are eligible for the energy transition bonus. It must be carried out by a qualified design office "RGE Études", according to the Th-CEX or 3CL-DPE 2021 method for any energy audit carried out until 12/31/2024 and according to the 3cl-DPE 2021 method for any energy audit carried out from January 1 , 2025.
The company carrying out the energy audit cannot subcontract all or part of the study.
The visit to the building for the purpose of the energy audit, in particular, is carried out by the company carrying out the energy study; This visit requires the physical movement of a person of the company at the place of the operation. .
- Annual conventional consumption in primary energy after work, reported to the reference surface of housing, less than 331 kWh/m². An for heating, cooling, production of domestic hot water, lighting, and heating, cooling, sanitary water and ventilation auxiliaries;
-Energy gain of at least 35 % compared to the annual conventional consumption in primary energy before work for the uses defined above.
The effective renovation project of the common areas may include several types of work, recommended by the energy audit: replacement of the heating system, the production of domestic hot water, thermal insulation of the walls, floors, replacement of windows, lighting, stallifies, ventilation etc.
Insulation, change of heating and DHW and ventilation equipment, carried out as part of the Th 177 bar sheet and its boost, must be carried out by a qualified professional (s) "recognized guarantor to the environment".
When work involves replacing the heating and/or domestic hot water system, it is compulsory to connect to a network of heat, provided that this is technically and economically viable. If this is not possible, the changes made to heating or the production of domestic hot water should not cause:
What are the amounts of bonuses?
Financial incitement is established at the following minimum values (expressed in euros per m²):
Minimum financial incitement (€/m²) | |||
Global renovation work | Including the replacement of all heating and production of domestic hot, fuel oil or gas domestic water with a heating or renewable hot water production system | 41 | |
Others | 27 | ||
The renewable system installed may include a fossil auxiliary, subject to respecting the conditions of this Charter and the Bar-Th-177 sheet in force.
The living area taken into account for the calculation of the financial incentive (expressed in m²) is the living area of the building after renovation.
Synthetical presentation of AMO services
In accordance with the efficient renovation boost charter of a collective residential building, Loris Enr, specialist in the valuation of EEC, will delegate the contracting services for project management and financing solutions to Enerlis.
ENERLIS, a global operator of the energy transition, offers an integrated approach: technical, financial, legal, AMO engineering, works management, aid & subsidies, CEE valuation, performance guarantees ... It designs, realizes and finances energy renovations by initiating its remuneration on the results observed.
As part of his service assistant service contracting (AMO), Enerlis offers his customers to support them throughout their project to change all heating or hot water production equipment with non -efficient coal or fuel oil.
Enerlis' mission will first of all be the realization of a study allowing to know its options and their challenges by specifying the different technical choices that can be set up for:
For each of the recommended solutions, Enerlis will specify:
Then, depending on the choice chosen, Enerlis will offer:
And as part of the financing of the works:
Control policy
The boost collective residential building and its bar-Th77 sheet requires the realization of controls on the visible and accessible parts, without survey or destructive samples by a control organization, controlled by Loris ENR. They are completed before the deposit of CEE requests to the National Pole of Energy Save Certificates (PNCEE).
The organization E Control leads control operations at the end of the energy audit phase and before carrying out the work and the completion of the work.
NB: The control body cannot control an operation for which it, if necessary, carried out the energy study.
These checks are carried out by an accredited control body according to the NF EN ISO/CEI 17020 standard applicable as a type A inspection organization for the field "Inspection of standardized energy savings operations within the framework of the device for the delivery of energy savings certificates".
Each controlled operation is subject to a report .
The control report attests:
- the date of the site visit of the control organization;
- information of identification of the beneficiary (name, address, number and nature of the lots, and when it is a condominium its registration number on the register of registration of the condominiums);
- the compliance of the work to the control benchmark defined in part and the E ter of Annex III of the decree of September 28, 2021 modified relating to the controls within the framework of the system of energy savings certificates;
-Den the qualification of companies intervening on the date of engagement of the operation when this qualification is required.
The report also provides elements of assessment on the quality of the work, in the event of a manifest breach of the rules of the art.
Loris Enr undertakes to provide corrective measures in the event of a problem detected during checks.
Other existing aid devices
The boost "efficient renovation of collective residential building" can be combined with Maprimerenov, the energy transition tax credit (CITE) 2020 and the zero-rate eco-loan. On the other hand, this device cannot be combined with the other incentives set up within the framework of the system of energy savings certificates in particular with the aid of the National Housing Agency valuing the certificates of energy savings of subsidized work as well as the aids to the unions of co -owners allocated within the framework of the program "to live better co -ownership".
The beneficiary can only claim, for the same operation, only one premium paid within the framework of the system of energy savings certificates (EEC). In addition, for the same building, the overall renovation operation cannot be combined with other operations that can give rise to the delivery of EEC for work concerning heating, domestic water production, ventilation or insulation of the envelope of this building.
Finally, to register in a renovation route and encourage you to carry out other renovation actions, we recommend that condominiums contact " free public service) that will guide you in carrying out other actions.
Within the framework of the system of energy savings certificates (EEC), Loris ENR participates in the operation "Blood renovation effective renovation of an individual house" set up by the Ministry of the Ecological and Solidarity Transition through the Decree of October 8, 2020 and modified by the Decree of December 10, 2021.
This device aims to financially encourage the owners and tenants of individual houses Carry out an efficient global renovation of their real estate assets , in particular when it allows you to reach an energy class A, B or C of the DPE.
Loris ENR sets up an offer for the overall renovation of individual houses among social landlords, by means of work carried out within the framework of the standardized ECE bar-Th-164 "Global renovation of an individual house (Metropolitan France)" in force.
“boost” offers , the overall renovation work for individual houses should make it possible to reach a drop in prime primary energy consumption (without deduction of self -consumed or exported electricity production) on heating, cooling and production of domestic hot water of at least 55 %.
Except for connection to a heat network, changes in heating equipment or domestic hot water production should not lead to:
The project will also have to have at least one gesture of isolation from three categories of work.
Evolution of the system from January 1 , 2022
Access to aid is simplified from January 1 , 2022.
Surprising will no longer be conditioned on obtaining a renewable heat rate, nor a function of a type of work. It will mainly depend on the performance of renovation in primary energy consumption after work.
As of April 1 , 2022, a control by an accredited organization must relate to the energy audit before work, to ensure the compliance and the relevance of the project vis-à-vis the initial situation. The points of vigilance of the controls before and after work are clarified.
Amount of premiums
The financial incentive is established at the following minimum values (expressed in euros by MWh of conventional annual consumption of final energy saved in the renovated building):
In each case of the above table, the date of engagement of the operation is equal to or after 06/01/2022.
How is the energy saving calculated?
The energy study is carried out in accordance with article 8 of the decree of November 17, 2020 relating to the technical characteristics and methods of carrying out the work and services whose expenses are eligible for the energy transition bonus. The company carrying out the energy study and meeting the requirements of the standardized Operation sheet Bar-Th-164 cannot subcontract all or part of the study. The visit to the building for the purpose of the energy study, in particular, is carried out by the company carrying out the energy study; This visit requires the physical movement of a person of the company at the place of the operation.
The total conventional consumption of final energy saved from a building is then obtained by applying the following calculation formula:
(Cefinitial - CefProjet) x Shab (expressed in kWh/year) , without deduction of self -consumed or exported electricity production,
Where "Cefinitial" is the total conventional consumption of final energy of the building before work and "CefProjet" is the total conventional consumption of final energy of the building after work, reported to the living area of the renovated building, expressed in kWh/m². An
and "Shab" is the living area of the renovated building, expressed in square meters.
Geographic coverage area
This boost operation is reserved for owners and tenants of individual houses in mainland France.
Our offer is not for individuals.
Conditions to obtain the boost premium
In order to benefit from the premium bonus effective renovation of a detached house, please follow this procedure:
Technical criteria and requirements to be observed
The operations are incurred between 06/01/2022 and 12/31/2025.
The operations are completed no later than 12/31/2026.
This boost improves a global renovation operation entering the field of the Bar-Th-164 . Also the following conditions must be respected to enter into this boost:
The design, realization and monitoring of the global renovation project are carried out by one or more certified companies "global offer" in accordance with the second dash of article 1 and in Appendix II of the decree of December 1, 2015 relating to the qualifications criteria required for the benefit of the tax credit for the energy transition and repayable advances without interest intended for the financing of renovation works in order to improve the energy performance old.
The works have at least one insulation gesture among the following three categories:
An energy study is carried out, prior to the thermal renovation work of the building, by a service provider fulfilling the conditions of II of article 1 of decree n ° 2018-416 of May 30, 2018 relating to the conditions of qualification of the listeners.
The calculation software allowing this energy study is adapted to a detached house. It has a written technical repository, a version number, a date and a period of validity. It uses a regulatory calculation engine or is validated by the CSTB , CEREMA or another independent design office after a technical assessment on standard case representative of the French park of individual houses and at the expense of the publisher. The validation request is made to the DGEC and the ADEME by the software publisher.
This request must include the written technical repository, the version number, the date and duration of validity of the software, as well as the test report produced by the CSTB, CEREMA or another independent design office. This report describes the standard casing used, and compares the results obtained with the regulatory calculation engine.
The list of software deemed to meet the requirements of the Bar-Th-164 is made public on the website of the Ministry of Energy.
The work makes it possible to achieve a minimum overall energy performance of the accommodation, determined by the energy study, which meets the following two criteria:
Annual greenhouse gas emissions after renovation, reported to the living area of the house, are less than or equal to the initial value of these programs before work.
To set up the CEE request file, the following elements must be provided:
When the work implemented differ from the work recommended, the thermal study is updated on the basis of the work actually carried out.
The synthesis of the thermal study as well as its possible update, are dated and signed by the professional who carried out them. They include the mentions of the following values:
Control policy
Loris Enr will make on-site checks carried out for operations relating to the standardized operating sheet Bar-Th-164 . The checks will be carried out, for the operations initiated from April 1 , 2022, following the energy audit, then whatever the date of engagement, following the work and prior to the deposit of EEC requests to the National Pole of Certificates of Energy Energy (PNCEE).
These controls are carried out by an accredited control body according to the NF EN ISO/CEI 17020 standard applicable as a type A inspection organization for the field "Inspection of standardized operations of energy savings within the framework of the device for the delivery of energy savings certificates.
Each controlled operation is subject to a report .
The control report attests:
The report also provides elements of assessment on the quality of the work, in the event of a manifest breach of the rules of the art.
Loris Enr undertakes to provide corrective measures in the event of a problem detected during checks.
Synthetic presentation of AMO services
Loris Enr, specialist in the valuation of EEC, will delegate the contracting services to project management and financing solutions to Enerlis .
ENERLIS, a global operator of the energy transition, offers an integrated approach: technical, financial, legal, AMO engineering, works management, aid & subsidies, CEE valuation, performance guarantees ... It designs, realizes and finances energy renovations by initiating its remuneration on the results observed.
As part of his service assistant service contracting (AMO), Enerlis offers his customers to support them throughout their project to change all heating or hot water production equipment with non -efficient coal or fuel oil.
Enerlis' mission will first of all be the realization of a study allowing to know its options and their challenges by specifying the different technical choices that can be set up for:
For each of the recommended solutions, Enerlis will specify:
Then, depending on the choice chosen, Enerlis will offer:
And as part of the financing of the works:
Other existing aid devices
“effective renovation of an individual house” boost can be combined with Maprimerenov ', the 2020 energy transition tax credit and the zero-rate eco-loan. On the other hand, this device cannot be combined with the other incentives set up within the framework of the system of energy savings certificates in particular with the aid of the National Housing Agency valuing the energy savings certificates of subsidized work.
The beneficiary can only claim, for the same operation, only one premium paid within the framework of the system of energy savings certificates (EEC). In addition, for the same building, the overall renovation operation cannot be combined with other operations that can give rise to the delivery of EEC for work concerning heating, production of domestic water, ventilation or insulation of the envelope of the house.
Finally, to register in a renovation route and encourage you to carry out other renovation actions, we recommend that the owners contact "Faire Public Service" (Free Public Service) who will guide you in carrying out other actions: www.faire.fr
Within the framework of the system of energy savings certificates (EEC), LORIS ENR participates in the operation "Coup de Pouce heating of collective and tertiary residential buildings" set up by the Ministry of Energy Transition through the decree of July 12, 2022.
The aim of this operation is to financially encourage owners or managers of collective residential buildings or buildings in the tertiary sector to replace their coal, fuel oil or unpropuous gas boiler (s).
It also intends to promote the connection to a heat network powered mainly by renewable or recovery energies (whether the origin of heat production is current or part of a decided project).
In the event of impossibility of such a connection, the boost operation provides for the establishment of heating or domestic water production equipment consuming neither coal nor fuel oil.
Loris Enr therefore sets up an offer for:
Or failing that:
Beneficiaries' eligibility criteria & geographic coverage area
This boost of collective and tertiary residential buildings is accessible to owners or managers of collective residential buildings or tertiary buildings (offices, teaching, health, hotels/catering, commerce and other) on French territory.
What bonuses for these work?
By contacting us, you can obtain a price per unit of energy saving, in Euro by mega watt-hour cumac (MWHC). The premium paid by Loris ENR for connection operations to a heat network will correspond to the volume of energy saving calculated via the formulas below and then multiplied by this price.
For the tertiary sector, the volume of energy saving improved by the boost is:
For the residential sector:
For the other types of work offered, the premium coup de Pouce paid by Loris Enr will correspond to the volume normally carried out via the CEE sheet, multiplied by the following bonus coefficient, then multiplied by the agreed price with Loris enr:
Form | Facility | Average volume* of saving made according to the EEC sheet (in MWHC) | Bonification (removal of an unspoken gas boiler **) | Bonification (removal of a fuel oil or non -efficient coal **) |
Bat-Th13 | Air/water or water/water CAP | ≈ 0.32 x s | x 3 | X 4 |
Bar-Th66 | ≈ 35 x n | |||
Bat-Th57 | Biomass boiler | ≈ 0.004 x q | ||
Bar-Th65 | ||||
Bat-Th-140 | Air/water/water/water absorption CAP | ≈ 0.57 x s | x 1.3 | x 2 |
Bar-Th50 | ≈ 71.9 x n | |||
Bat-Th-141 | Air/water gas engine | ≈ 0.54 x s |
*The volume evolves upwards and downwards depending on the technical parameters specific to the technology and the equipment installed. The quantities are:
S, the heated surface;
N, the number of dwellings served by the installation;
Q, the useful clear heat produced in kWh/year by the installed equipment, determined in a dimensioning study.
** Other than condensation
Conditions to obtain the prime tertiary boost
In order to benefit from the boost heating of collective and tertiary residential buildings, please follow the process described below:
Technical criteria and requirements to be observed
The work eligible for these offers is undertaken between 09/01/2022 and 12/31/2025 .
The operations are completed no later than 12/31/2026.
This boost only works in the coal, fuel oil or non -efficient boilers (any technology other than condensation). The removal of the equipment must appear on the proof of realization with the precision that it is not a condensing boiler.
The connection to a heat network is offered as a first alternative.
If the connection to the heat network is not possible, the heat network manager must provide the justification for the technical or economical impossibility of the connection.
Once this document has been collected, the other equipment offered as part of this boost heating of collective and tertiary residential buildings are also eligible for bonus.
The technical and administrative characteristics to be observed are as follows, by type of work:
Connection to a heat network
The said network must mainly be supplied by renewable or recovery energies (in its current state or within the framework of a decided project).
Eligible buildings have never been connected to a heat network in the 5 years preceding the date of engagement of the operation and for which the previous connections, if there were, have never been the subject of a request for CEE.
The implementation is carried out by a professional.
The file may require the signature of the network manager if it is different from the professional who implemented the connection.
Air/water heat pump, water/water, glycolé/water water
Several technologies are eligible: CAPs not operating on gas, fuel oil or coal or with an extra device, absorption CAP operating with natural gas or propane and gas motor pac (only in the tertiary sector).
In all cases, the installed PAC (s) provide the heating of the premises or the heating and the production of domestic hot water.
The implementation is carried out by a professional.
Add to this the following conditions:
It is determined according to Regulation (EU) No. 813/2013 of the Commission of August 2, 2013.
The COP is defined as the ratio between the useful calorific power delivered by the CAP and the sum of the calorific flow of gas (when there is one) and the electrical power absorbed by the PAC. When the CAP operates without gas, it is measured in accordance with the nominal performance conditions of the standard EN 14511-2.
Collective biomass boiler
The establishment of a biomass boiler is subject to a preliminary study of established dimensioning, dated and signed by a professional or a design office and specifying the heat needs of the building.
The installed boiler must use woody biomass especially based on wood logs, wood chips, compressed wood in the form of granules or in the form of briquettes, or sawdust.
The boiler power mode can be:
The boiler (s) must be equipped with a minimum class IV regulator and the useful net heat produced by all installed biomass boilers must be strictly less than 12 GWh/year.
The implementation is carried out by a professional.
Add to this the following conditions:
The installed boiler meets the following criteria according to its loading method:
The seasonal particle emissions are less than 60 mg/nm3;
The seasonal carbon monoxide (CO) shows are less than 700 mg/nm3;
Seasonal nitrogen oxide (NOX) emissions are less than 200 mg/nm3;
The seasonal emissions of organic gaseous compounds are less than 30 mg/nm3;
The seasonal particle emissions are less than 40 mg/nm3;
The seasonal carbon monoxide (CO) shows are less than 500 mg/nm3;
Seasonal nitrogen oxide (NOX) emissions are less than 200 mg/nm3;
Seasonal emissions of organic gaseous compounds are less than 20 mg/nm3.
Concentration values are expressed in MG/NM3 at 10% O2.
For nominal power boilers less than or equal to 70 kW, the 7* green flame label allows you to satisfy the above conditions relating to atmospheric emissions.
The concentration values are expressed in MG/NM3 on dry gas at 6 % O2.
Cumulation with other existing aid devices
The owner or building manager can only claim, for the same type of work, only one premium paid within the framework of the system of energy savings certificates.
In addition, the premium "boost heating of collective and tertiary residential buildings" cannot be combined with the other incentives set up within the framework of the system of energy savings certificates.
ADEME aid under certain conditions. In particular, the cumulation is possible with "Maprimerénov 'Serenity" since July 1, 2022 subject to support in your energy renovation work. You will find more details on Francerenov '(free public service): https://france-renov.gouv.fr/aides
As part of the system of energy savings certificates (CEE), Loris ENR participates in the operation "Coup de pilot connected of the heating piece by piece" set up by the Ministry of Energy Transition through the decree of November 22, 2023.
The purpose of this operation is to financially encourage owners or housing tenants to equip them with a centralized device allowing programming and differentiated regulation of the interior temperature.
Loris Enr therefore sets up an offer for regulation systems by hourly programming by piece (Bar-Th-173).
Beneficiaries' eligibility criteria & geographic coverage area
This boost boost connected piloting of the room heating by piece is accessible to the owners, managers or tenants of apartments in individual heating or individual houses on French territory.
What bonuses for these work?
Through this offer, Loris Enr undertakes to offer you a bonus of at least € 520 x C, where it is a coefficient relating to the heated surface of your accommodation:
Heated surface S (in m²) | Coefficient c |
S <35 | 0,5 |
35 ≤ s <60 | 0,6 |
60 ≤ s <70 | 0,7 |
70 ≤ s <90 | 0,8 |
90 ≤ s <110 | 1 |
110 ≤ s ≤ 130 | 1,1 |
S> 130 | 1,2 |
Conditions to obtain the premium
In order to benefit from the boost heating of collective and tertiary residential buildings, please follow the process described below:
Technical criteria and requirements to be observed
To benefit from this offer, the work must be initiated between 01/12/2023 and 12/31/2024.
Part Part Schedule Regulation System
The operation consists in setting up a heating regulation system with a central steering unit communicating with all the heat transmitters in the accommodation, without exception.
The main unit should centralize the information of the devices deported in each of the heated parts, to pilot it and to program the interior temperature instructions in a differentiated manner (standards in 12098-1 and in 12098-3), depending on the time slots.
To do this, each of the heated parts must be equipped with an ambient temperature measurement probe as well as a deported regulation device.
The settings and the execution of the programming must at least be able to be carried out locally and are not interrupted by a possible loss of internet connection.
In addition to these elements, the system must recover in real time the ECOWATT or ECOGAZ signal (directly or relayed within a signal issued by the energy supplier) and automatically restore it to the user.
Cumulation with other existing aid devices
The beneficiary of the operation can only claim, for the same type of work, only one premium paid within the framework of the system of energy savings certificates.
In addition, the bonus "boost connected piloting of heating part per piece" cannot be combined with the other incentives set up within the framework of the system of energy savings certificates.
However, it can be combined with other aid devices such as zero-rate eco-loan, reduced rate VAT or local authorities or ADEME aid under certain conditions. In particular, the cumulation is possible with "Maprimerénov 'Serenity" subject to support in your energy renovation work. You will find more details on Francerenov '(free public service): https://france-renov.gouv.fr/aides
As part of the system of energy savings certificates (CEE), Loris ENR participates in the "boost" ample renovation of individual houses and apartments "set up by the Ministry of Energy Transition through the decree of December 19, 2023 .
The purpose of this system is to financially encourage the owners of busy housing as a secondary residence and to social landlords, under resource conditions, to benefit from an exceptional premium to help them finance an optimal-economic optimal work bouquet.
Loris Enr sets up an offer for the large-scale renovation of the houses, occupied as a second home, and individual apartments in social landlords, by means of work carried out within the framework of the standardized ECE -Th-174 "renovation of a single house (metropolitan France) and the standardized operating sheet CEE Bar-Th-175 " metropolitan) in force.
This offer provides for a financial incitement, to operations incurred until December 31, 2025 and completed no later than December 31, 2026.
Technical criteria and requirements to be observed
The work consists of a global thermal renovation of an existing individual house for more than two years on the date of engagement of the operation in mainland France aimed at implementing an optimal-economic work bouquet of work.
Prior to the realization of renovation work, a design office carries out an energy assessment, with the 3CL DPE 2021 methodology or an admissible methodology within the framework of the audits defined by decree.
In the event of a second stage of work, the energy audit carried out during the first step is reused. It can be updated, provided that the work of the first step corresponds to the proposal of the work route by stages of the audit.
For the same accommodation and the same beneficiary, the work can be carried out at most two stages under this sheet, for class E, F or G accommodation before the first stage of work.
Technical criteria and requirements to meet:
For the first stage of work, the following cumulative conditions are respected:
Whatever the work stage, the following cumulative conditions are respected:
In the case of work in two stages, the second stage of work makes it possible to reach at least class C for class F or G housing before the first stage of work, and at least class B for class E housing before the first stage of work. The work in two stages is only possible if the first stage of work corresponds to a jump of at most 3 classes.
The work implemented corresponds to one of the scenarios proposed by the energy audit, which must in particular provide the additional work to guarantee a sufficient renewal of air.
Qualification of the professional (s) intervening:
For each category of work integrated into the large-scale renovation project and mentioned in 1o to 16o of IT of article 1 of decree no 2014-812 of July 16, 2014 taken for the application of the second paragraph of 2 of article 200 quater of the general tax code and the last paragraph of 2 of I of article 244 quater U of the general tax code, the professional carrying out the operation of a quality sign in article 2 of the same decree and in the texts taken for its application. This sign of quality corresponds to works falling either from 17o of I of article 1 of the aforementioned decree, or of one of the categories mentioned in 1o to 16o of the I of the same decree corresponding to the work carried out.
Proof of carrying out the operation:
It mentions the list of work carried out with their performance levels.
Justifying documents specific to the operation:
When the work implemented differ from the work recommended, the energy audit is updated on the basis of the work actually carried out.
The synthesis report of the energy audit, as well as its possible update, are dated and signed by the service provider having made them. They include the mentions of the following values:
II- Bar-Th-175 : renovation of apartments (Metropolitan France):
The works consist of a global thermal renovation of an existing apartment for more than two years on the date of engagement of the operation in mainland France aimed at implementing an optimal-economic optimal work bouquet.
An energy audit is carried out on the scale of the apartment, prior to magnitude renovation work.
In the event of a second stage of work, the energy audit carried out during the first step is reused. It can be updated, provided that the work of the first step corresponds to the proposal of the work route by stages of the audit.
An energy audit carried out before April 1, 2024 is deemed to be satisfied for operations undertaken until September 30, 2024.
The work only concerns the private parties.
For the same accommodation and the same beneficiary, the work can be carried out at most two stages under this sheet, for class E, F or G accommodation before the first stage of work.
Technical criteria and requirements to meet:
For the first stage of work, the following cumulative conditions are respected:
Whatever the work stage, the following cumulative conditions are respected:
In the case of work in two stages, the second stage of work makes it possible to reach at least class C for class F or G housing before the first stage of work, and at least class B for class E housing before the first stage of work. The work in two stages is only possible if the first stage of work corresponds to a jump of at most 3 classes.
The work implemented corresponds to one of the scenarios proposed by the energy audit, which must in particular provide the additional work to guarantee a sufficient renewal of air.
Qualification of the professional (s) intervening:
For each category of work integrated in the major renovation project and mentioned in 1 ° to 16 ° of I of article 1 of decree n ° 2014-812 of July 16, 2014 taken for the application of the second paragraph of 2 of article 200 quater of the general tax code and the last paragraph of 2 of I of article 244 quater u of the general tax code, the professional carrying out the operation is a sign of quality provided for in article 2 of the same decree and in the texts taken for its application. This sign of quality corresponds to works falling either from 17 ° of I of article 1 of the aforementioned decree, or of one of the categories mentioned in 1 ° to 16 ° of the I of the same decree corresponding to the work carried out.
Proof of carrying out the operation:
It mentions the list of work carried out with their performance levels.
Justifying documents specific to the operation:
When the work implemented differ from the work recommended, the energy audit is updated on the basis of the work actually carried out.
The synthesis report of the energy audit, as well as its possible update, are dated and signed by the service provider having made them. They include the mentions of the following values:
What bonuses for these work?
The premium is established at the minimum values for individual houses or apartments, following the number of class jumps allowed by large -scale renovation work and the living area of the accommodation before renovation:
Number of class jumps | Minimum amount in € | X | Correct factor according to the Shab living space | Shab living area in m² |
2 | 4 700 | 0,4 | Shab <35 | |
0,5 | 35 ≤ shab <60 | |||
3 | 5 800 | 0,8 | 60 ≤ shab <90 | |
1 | 90 ≤ shab <110 | |||
4 or more | 7 400 | 1,2 | 110 ≤ shab ≤ 130 | |
1,3 | 130 <shab |
Shab is the living area (expressed in m²) of the house before the work of the first or the only step of work.
Conditions to obtain the premium boost “ample renovation of individual houses and apartments”
In order to benefit from the premium boost "renovation of magnitude of individual houses and apartments", please follow the process described below:
Synthetical presentation of AMO services
Loris Enr, specialist in the valuation of EEC, will delegate the contracting services to project management and financing solutions to Enerlis.
ENERLIS, a global operator of the energy transition, offers an integrated approach: technical, financial, legal, AMO engineering, works management, aid & subsidies, CEE valuation, performance guarantees ... It designs, realizes and finances energy renovations by initiating its remuneration on the results observed.
As part of his service assistant service contracting (AMO), Enerlis offers his customers to support them throughout their project to change all heating or hot water production equipment with non -efficient coal or fuel oil.
Enerlis' mission will first of all be the realization of a study allowing to know its options and their challenges by specifying the different technical choices that can be set up for:
For each of the recommended solutions, Enerlis will specify:
Then, depending on the choice chosen, Enerlis will offer:
And as part of the financing of the works:
Control policy
The boost charter "renovation of magnitude of individual houses and apartments" provides controls on all the global renovation operations carried out as part of the Bar-Th-174 or Bar-Th-175 sheet and the Charter, committed from the date of effect of the signed charters. These checks are carried out before the deposit of energy savings certificates (EEC) with the National Pole of Energy Economies (PNCEE).
These checks are carried out by an accredited control body according to the NF EN ISO/CEI 17020 standard applicable as a type A inspection organization for the field "Inspection of standardized energy savings operations within the framework of the device for the delivery of energy savings certificates". Each controlled operation is subject to a report bounded at the disposal of the PNCEE.
A summary of the controls carried out on the operations of a request file is carried out by the control body. This synthesis includes the list of controlled operations, the controlled parameters, the results obtained, the differences observed including on the quality of the work and the unwanted controls.
Loris Enr is available to the PNCEE, for each request file containing operations relating to this Charter, the summary of the controls carried out on the operations included in this request as well as information on the follow -ups given to the unmet controls.
Loris Enr undertakes to provide corrective measures in the event of a problem detected during checks. In the event of corrective measures deemed insufficient, the signatory's commitment is deciduous after formal notice by the energy responsible for energy not followed by effects.
Is the premium cumulative with other aids?
The boost "renovation of magnitude of individual houses and apartments" cannot be combined with the other incentives set up within the framework of the EEC system, in particular with the anh aid valuing the EEC of subsidized work.
The beneficiary can only claim, for the same operation, only one premium paid within the framework of the EEC system elsewhere, for the same building, the large -scale renovation operation cannot be combined with other operations that can give rise to the delivery of EEC for work concerning heating, the production of domestic hot water, ventilation or insulation of the envelope of the house.
Finally, to register in a renovation route and encourage you to carry out other renovation actions, we recommend that the owners contact "Faire Public Service" (Free Public Service) who will guide you in carrying out other actions: www.faire.fr